Efficient Surge Anticipation Valve to Prevent Pressure Surges

Product Details
Customization: Available
Temperature: Ordinary Temperature
Certification: ISO9001
Still deciding? Get samples of $ !
Request Sample
Gold Member Since 2025

Suppliers with verified business licenses

Audited Supplier Audited Supplier

Audited by an independent third-party inspection agency

  • Efficient Surge Anticipation Valve to Prevent Pressure Surges
  • Efficient Surge Anticipation Valve to Prevent Pressure Surges
  • Efficient Surge Anticipation Valve to Prevent Pressure Surges
  • Efficient Surge Anticipation Valve to Prevent Pressure Surges
  • Efficient Surge Anticipation Valve to Prevent Pressure Surges
  • Efficient Surge Anticipation Valve to Prevent Pressure Surges
Find Similar Products
  • Overview
  • Product Description
  • Detailed Photos
  • Company Profile
  • Packaging & Shipping
  • FAQ
Overview

Basic Info.

Model NO.
N550
Media
Water
Standard
Standard
Connection Mode
Flange
Power
Hydraulic
Material
Stainless Steel
Type
Self-Operated
Pressure Ratings
Pn10/16/25/40, ANSI Class 150/300
Materials(Optional)
Ductile Iron, Duplex, Bronze
Seals
NBR/EPDM/HNBR
Transport Package
Wooden Case
Specification
DN40– DN1200
Origin
Shanghai, China
HS Code
8481801090
Production Capacity
2000PC Per Month

Product Description

Product Description


Surge Anticipation Valve

Surge Anticipation Valve is indispensable for protecting pumps, pumping equipment and all applicable pipelines from dangerous pressure surges caused by rapid changes of flow velocity within a pipeline. When pumping systems are started and stopped gradually, harmful surges do not occur. However, should a power failure take place, the abrupt stopping of the pump can cause dangerous surges in the system which could result in severe equipment damage. Power failure to a pump will usually result in a down surge in pressure, followed by an up surge in pressure. The surge control valve opens on the initial low pressure wave, diverting the returning high pressure wave from the system. In effect, the valve has anticipated the returning high pressure wave and is open to dissipate the damage causing surge. The valve will then close slowly without generating any further pressure surges.
 
Efficient Surge Anticipation Valve to Prevent Pressure Surges
Efficient Surge Anticipation Valve to Prevent Pressure Surges
Efficient Surge Anticipation Valve to Prevent Pressure Surges


Key Features
  1. Dual-Function Design
    • Combines the core functionality of the N20D dual-stage pressure reducing valve with advanced surge anticipation technology, ensuring seamless pressure transitions and water hammer prevention.
  2. Smart Integration
    • Fully compatible with IoT-enabled systems, including:
      • PLC controls for automated adjustments.
      • Pressure sensors & flow meters for real-time monitoring.
      • Remote data transmission (SCADA/4G/5G) for centralized management.
  3. Wide Application Range
    • Sizes: DN40-DN1200
    • Pressure Ratings: PN10/16/25/40, ANSI Class 150/300
    • Materials: QT500-7 (ductile iron), SUS304/316, SAF2205 (duplex), bronze.
    • Seals: NBR/EPDM/HNBR for chemical/thermal resistance.
  4. Performance Highlights
    • Instant Response: Opens within <0.5 seconds during pressure surges.
    • Zero-Leak Closure: Drip-tight sealing even at zero flow.
    • Energy Efficiency: Reduces pump stress and pipeline wear, lowering operational costs.
Detailed Photos

 
Efficient Surge Anticipation Valve to Prevent Pressure SurgesEfficient Surge Anticipation Valve to Prevent Pressure SurgesEfficient Surge Anticipation Valve to Prevent Pressure SurgesEfficient Surge Anticipation Valve to Prevent Pressure Surges
Company Profile

 

Efficient Surge Anticipation Valve to Prevent Pressure SurgesEfficient Surge Anticipation Valve to Prevent Pressure Surges
Packaging & Shipping

Efficient Surge Anticipation Valve to Prevent Pressure SurgesEfficient Surge Anticipation Valve to Prevent Pressure Surges

FAQ

1. What is your term of payment?
A: 30% advance payment, 70% to be paid before delivery after goods are ready.


2. How about your delivery time?
A: Delivery Lead Time: Standard shipment within 30 days. Exact delivery date will be confirmed based on order quantity and specific requirements.


3. Can you produce products with my own brand?
A: Yes, we can offer OEM services.

 


 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier